{1}
##LOC[OK]##
City of Newcastle
Washington
MENU
City Hall
Contact Us
City Council
City Documents
City Finances
City Manager
City Meetings
Commissions
City Regulations
Elections and Voting
Hours and Location
Public Notices
Departments
City Manager
Community Development
City Clerk
Finance
Fire and EMS
Human Resources
Organizational Chart
Police
Public Works
Your Community
Active Projects
All About Newcastle
Animal Care and Living with Wildlife
Communications and Alerts
Door to Door Solicitors
Events
Garbage and Recycling
In Your Neighborhood
Maps and Data
Parks, Trails and Other Recreation
Public Safety
Utilities
Volunteering
Severe Weather
Report an Issue
Community Satisfaction Survey
Veterans' Resources
Doing Business
Event Vendors
For Developers
Licensing and Permits
Newcastle Chamber of Commerce
Sales Tax
Grants
I Want To...
Apply For
Find
Get Information About
Report
Submit a Public Records Request
Sign Up For
Menu
City Hall
Contact Us
City Council
City Documents
City Finances
City Manager
City Meetings
Commissions
City Regulations
Elections and Voting
Hours and Location
Public Notices
Departments
City Manager
Community Development
City Clerk
Finance
Fire and EMS
Human Resources
Organizational Chart
Police
Public Works
Your Community
Active Projects
All About Newcastle
Animal Care and Living with Wildlife
Communications and Alerts
Door to Door Solicitors
Events
Garbage and Recycling
In Your Neighborhood
Maps and Data
Parks, Trails and Other Recreation
Public Safety
Utilities
Volunteering
Severe Weather
Report an Issue
Community Satisfaction Survey
Veterans' Resources
Doing Business
Event Vendors
For Developers
Licensing and Permits
Newcastle Chamber of Commerce
Sales Tax
Grants
I Want To...
Apply For
Find
Get Information About
Report
Submit a Public Records Request
Sign Up For
Railroad Embankment Project (S-017)
Skip Sidebar Navigation
Railroad Embankment Project (S-017)
Transportation Improvement Program (TIP)
Lake Boren Master Plan Update (P-022)
Railroad Embankment Project (S-017)
Storm Conveyance Rehab Program (S-038)
Hazelwood Park Reforestation Project (P-023)
May Creek Park Drive Non-Motorized Improvements (T-047)
FAQ's: Slurry Seal (T-011)
Last item for navigation
tab visible
City of Newcastle
»
Departments
»
Public Works
»
City Projects
»
Railroad Embankment Project (S-017)
Share this page
A-
A+
Project Summary
The Newcastle Railroad Embankment was constructed as part of the railroad line which transported coal from Newcastle to Seattle during the 19th and early 20th centuries. The embankment is 55 feet tall and 150 feet long. May Creek Trail is located on top of the embankment. Newport Hills Creek flows under the embankment in a long culvert. A vertical pipe, called a standpipe, was attached to the upstream end of the culvert at least 40 to 50 years ago. The purpose of the standpipe was to create a small pond. The standpipe is not functioning properly, which is causing the pond level to increase.
Phase 1 of the project removed the failing standpipe and installed a new standpipe at the same location. Phase 1 construction was completed in October 2020. A
project status report was presented to City Council
on December 1, 2020. Phase 2 of the project will remove the standpipe and culvert to restore free flow and fish passage to Newport Hills Creek. Newcastle refers to this project as S-017.
Contact Project Manager Brian Miller,
[email protected]
, with questions.
Project Location
Background
Current Conditions
Located within May Creek Park, the Railroad Embankment over Newport Hills Creek (embankment) is a historic railroad bridge built and used during Newcastle's coal-mining era. Under the embankment Newport Hills Creek flows through a 24" clay vitrified pipe culvert that is approximately 212 feet long. Flow into the culvert is obstructed by a primitive control structure (standpipe), which created an artificial pond on the north side (upstream) of the embankment. When water in the pond is at the level of the standpipe, the pond holds 15 acre-feet of water. If the pond level were to reach the top of the embankment the pond would hold 120 acre-feet of water, the equivalent of 60 Olympic-sized swimming pools. If the embankment were to breach or fail, the water would travel for 800 feet downstream to May Creek, and then for another 2.5 miles before it reaches Lake Washington.
The embankment is considered a dam and is on Washington State's dam inventory. A periodic inspection by
Washington State Department of Ecology's Dam Safety Office
(DSO) in 2018 indicated that the embankment is in poor condition. Over the past few years the standpipe has become blocked, which has caused dramatic increases and decreases in the pond depth. The design of the standpipe is unknown. As a result, the pond depth dramatically increased during the December 2019 and the February 2020 storm events. Due to the unknown construction and stability of the embankment, combined with the inability to control the pond depth, action must be taken to prevent a catastrophic failure of the embankment. The City was awarded a
FEMA High Hazard Potential Dams (HHPD) grant
in both 2019 and 2020 for this project.
Phase 1 improvements were completed in October 2020 to address the immediate concern of the blocked outfall standpipe. The new standpipe features an improved outflow along with a debris cage to prevent blockage.
Plan & Estimated Timeline
The S-017 Project Consists of Two Phases
Phase 1
Phase 1 removed the failing standpipe and installed a new standpipe at the same location. Phase 1 construction was completed in October 2020. The new standpipe is approximately 7 feet shorter than the existing standpipe causing the pond size to be reduced.
Link to
Project Update Slides
(PDF, 9.4 MB) following completion of Phase 1 construction.
Phase 2
Phase 2 will remove the standpipe and culvert to restore free flow and fish passage to Newport Hills Creek. The pond will be eliminated and the area immediately upland of the embankment will be restored. It will also involve partial or full removal of the embankment. As a result, the existing trail will have to be relocated. Final design for Phase 2 will being in 2022 and is scheduled for completion in 2023. Construction of Phase 2 is dependent of available finding. It is anticipated that a significant majority (at least 2/3) of the construction cost will be grant funded.
What's Next?
Partners and Funding Support
King County Office of Emergency Management
Federal Emergency Management Agency (FEMA)
Washington State Department of Ecology
City of Newcastle | All Rights Reserved | Powered by
CivicLive | © 2024 Civiclive.